Requirements Checklist
|
Requirements |
|
| Duly Accomplished and Notarized Locational Clearance Application Form | |
|---|---|
|
Proof of Right-Over-Land
Note: In case the Property is not registered in the name of applicant, submit photocopy of the following:
Duly notarized deed of sale/ deed of donation
Contract of Lease; MOA, Usufruct of Agreement
Affidavit of Consent / Authorization to use land, whichever is applicable
Certified True Copy of Transfer Certificate of Title
Certified True Copy of Tax Declaration
Current Tax Receipt of Non-Tax Delinquency Certificate
Barangay/Assessor's Certification if Lot is Not Titled
CENRO Certification if Lot is not Titled
Note: In case the Property is registered in the name of applicant, submit photocopy of the following:
Certified True Copy of OCT / TCT
Tax Declaration
Current Tax Receipt of Non-Tax Delinquency Certificate
|
|
|
Bill of Materials
Note: The documents should be:
Reflective of the total amount of construction cost of the project;
Signed & Sealed by a duly authorized professional;
Conformed by the applicant.
|
|
|
Five (5) Sets of Building Plans
Signed & sealed by Architect / Civil Engineer
Vicinity Map with technical description & lot coordinates
Site Development Plan
|
|
|
Prior CONSTRUCTION/EXPANSION/RENOVATION |
|
|
Distance/Clearance Requirements if applicable
Road Right-of-Way Clearance from DPWH or PEO
DENR Watershed Clearance (Protected / Non-Protected Area)
DENR Waterway Clearance
DAR Clearance/ Conversion Order/Exemptions (if the proposed site is Agricultural area)
|
|
|
Environmental Compliance if applicable
Environmental Compliance Certificate
Certificate of Non-Coverage
|
|
|
Prior CELL SITE/TOWER |
|
| Environmental Compliance Certificate (ECC) from DENR (if the proposed site is within an environmentally critical area) | |
| Land Use Conversion from DAR (if the proposed site requires conversion of an agricultural land area) | |
| Special Use Agreement (if the proposed site is a Protected area) | |
| Certification (from DPWH/NORSAMELCO), if applicable | |
| Height Clearance Permit from CAAP (except if the proposed site is outside the CAAP Critical area and below (50)meters in height above the elevation of the ground) | |
|
Written Consent
If the proposed project is within subdivision
Approval of the HOA and all members whose properties abut the proposed project site.
In the absence of a HOA, consent/affidavit of non-objection from majority of actual occupants and owners of properties within a radial distance. Equivalent to the height of the proposed project including those abutting the proposed site.
On Buildings – occupied or unoccupied:
Consent of the owner/developer
Approval of the governing board/body including all tenants occupying the topmost floor directly below the proposed project and the consent of the owner and majority of tenants of adjoining buildings.
|
|
|
Prior POULTRY/PIGGERY/RICEMILL/FUNERAL PARLOR/SLAUGHTERHOUSE or ABATTOIR/COCKPIT |
|
| Environmental Compliance Certificate (ECC) or Certificate of Non-Coverage (CNC) from DENR – EMB | |
| Conversion Order (CO) or Exemption Clearance (EC) from DAR | |
| Site Clearance from the Local Health Officer or Municipal/City Veterenarian concerned on the suitability of the location pursuant to Chapter IX of PD 856’s IRR on Nuisance and Offensive Trade and Occupation | |
| Barangay Clearance | |
| Barangay Resolution/Affidavit of No Objection from Adjacent Occupants | |
NOTE: Additional requirements may be required after inspection and evaluation of documents. All documents should not be more than 3 months old upon filing.
Make sure all the required documents are complete before proceeding with the application.
Click on the Apply button below to proceed.